< Home

Cabling Requirements

  • Only cut the insulation layer at the wiring part when preparing the power cable at the site. Doing so prevents accidents and fire from short circuit.
  • High-temperature environments may cause wear and tear on the insulation layer. Leave sufficient clearance between the cable and power busbar, current shunt, fuse, heat sink and other heating devices.
  • Bind the signal cable and the strong current or high-voltage cable separately.
  • Cables provided by the customer must comply with local cable regulations.
  • Do not route any cable through the air exhaust vent in the cabinet.
  • If cables have been stored in an ambient temperature below 0 °C (32 °F), move the cables to a room-temperature environment at least 24 hours before installation
Copyright © Huawei Technologies Co., Ltd.
Copyright © Huawei Technologies Co., Ltd.
< Previous topic Next topic >