Pre-configuration Tasks
Before deploying zero touch devices using an intermediate file, complete the following tasks:
- Configure routing to ensure that the DHCP server, file server, and devices to be configured (have obtained IP addresses) have reachable routes to each other.
- Collect each zero touch device's MAC address or ESN by viewing the barcode label on the device.
Procedure
Perform the following operations in sequence.