Table 1 describes the link aggregation configuration tasks.
Scenario | Task |
---|---|
Switches Are Directly Connected |
Perform either of the two operations: |
Switches Are Connected Across a Transmission Device |
|
A Switch Connects to a Server |
Perform either of the two operations: |
Using E-Trunk Between Multiple PEs Connected to a CE NOTE:
E-Trunk is supported by only the following models: S5720-EI, S5720-HI, S5720I-SI, S5720S-SI, S5720-SI, S5735-S, S5735S-S, S5735-S-I, S5730-HI, S5730S-EI, S5730-SI, S5731-H, S5731-S, S5731S-H, S5731S-S, S5732-H, S6720-EI, S6720-HI, S6720-LI, S6720S-EI, S6720S-LI, S6720S-SI, S6720-SI, S6730-H, S6730S-H, S6730-S, and S6730S-S. |