After controlling RIP routing information, verify all activated
routes in the RIP database and the running status of RIP.
Prerequisites
RIP routing information has been controlled.
Procedure
- Run the display rip process-id database command to check all active
routes in the RIP database.
- Run the display rip process-id command
to check the running status and configuration of the RIP process.