Verifying the Configuration

Procedure

  1. After the device is started, log in to it and run the display startup command to check whether the startup file of the device meets requirements.
  2. Run the display sztp status command to check whether the device is deployed through SZTP.

    After the replace operation is performed, you can run the display configuration rollback result command to check the configuration rollback result.

Copyright © Huawei Technologies Co., Ltd.
Copyright © Huawei Technologies Co., Ltd.
< Previous topic